Small modular reactors

Small modular reactors package a lower-output fission system around repeatable modules and factory-oriented construction. The category includes several coolants, fuels, and neutron spectra rather than one design.

  • fission
  • modular construction
  • advanced reactors

Technical deep dive

How it works

Like larger reactors, an SMR maintains a controlled fission chain reaction and removes the resulting heat with a coolant. Compact integral layouts can place major primary-system components inside one vessel, while passive systems use gravity, natural circulation, and stored inventories to respond to faults. The economic case depends on repeating a standardized design often enough for manufacturing and project learning to offset the loss of scale per unit.

What is—and is not—an SMR

The IAEA commonly uses up to 300 MWe per module as the small-reactor boundary. Modular refers to factory fabrication, transportable subassemblies, repeated modules, or staged capacity—not simply low output. Designs include pressurized-water reactors, boiling-water reactors, gas-cooled reactors, sodium or lead fast reactors, molten-salt concepts, and microreactors, so no single coolant, fuel, or safety case describes the entire class.

An integral pressurized-water SMR places the core, steam generators, and pressurizer inside or immediately around one reactor vessel. Shortening or eliminating large primary coolant pipes reduces large-break loss-of-coolant pathways. Natural circulation, gravity-fed inventories, stored heat capacity, and passive heat exchangers can extend coping time without powered pumps.

Neutronics, heat removal, and modular operation

Fission control remains conventional: delayed neutrons make the chain reaction controllable, soluble absorbers or control rods adjust reactivity, and shutdown does not eliminate decay heat. Smaller cores have greater surface area relative to power, which can help passive heat rejection, but leakage and fuel utilization differ from large cores. Multiple modules may share turbines, control rooms, cooling, security, and site infrastructure.

Load following depends on the reactor design and steam system. A site can vary total output by changing individual modules or by diverting heat to storage, hydrogen, or industrial loads. Common facilities reduce unit cost but can also create shared-system dependencies that must be treated in licensing and reliability analysis.

The economic hypothesis

Large reactors buy less equipment per megawatt; SMRs try to recover that scale penalty through design standardization, factory learning, shorter site work, repeat orders, and incremental financing. The outcome depends on production volume, supplier qualification, transport limits, interest during construction, owner staffing, and how much infrastructure modules share.

A regulatory design approval establishes that a reference design can satisfy a regulator's safety requirements. It does not establish construction cost, schedule, capacity factor, fuel availability, or demand. Those require completed projects and repeated operation.

Reason to use it

What could make it valuable

Smaller increments may fit more grids and industrial sites, while repeatable factory production could eventually reduce construction uncertainty.

Unresolved engineering

What still blocks it

The benefits depend on licensing, manufacturing volume, supply chains, financing, fuel availability, and delivered cost—not simply making a reactor smaller.

They may fit smaller grids and incremental projects, but licensing, financing, supply chains, construction learning, and cost per delivered megawatt remain decisive.

Monthly evidence layer

Research watch

Named programs, dated developments, and primary or official sources. Company claims are identified separately from independent or peer-reviewed evidence.

Last reviewed 6 September 2026

Research groups & programs

Current developments

  1. May 2025

    NRC completed the NuScale US460 standard-design review

    The approval covers a six-module, 462 MWe reference plant. Project construction and commercial performance remain separate steps.

  2. Current frontier

    Attention is moving from design claims to delivery evidence

    The decisive evidence will be licensed construction, repeated component manufacture, completed schedules, fuel qualification, and operating data.